摘要 |
An integrated circuit and a method for efficiently operating integrated circuit devices. The integrated circuit includes an input that is configured to receive a first current which is representative of a leakage current drawn by leakage in a portion of the integrated circuit. The integrated circuit includes a leakage calibrator that is configured to compare the first current to a current required to perform a switching operation and output a value indicative of the leakage. |