发明名称 METHOD FOR CONSTRUCTING UNITED JOINT OF TUBE FILLED CONCRETE BLOCK
摘要 PURPOSE: A constructing method of a steel pipe buried concrete block integrated point is provided to cope with displacement and the temperature load which are generated according to the temperature change. CONSTITUTION: A constructing method of a steel pipe buried concrete block integrated point is composed like next. A shoe(120) is established on the upper side of a bridge post(110) or abutment. A concrete block(130) is poured on the upper side of the shoe and settled in a precast type. Each connecting member is integrally filled to the upper and lower side of the concrete block. The upper and lower chords of a charge steel pipe truss girder are connected with connecting member. A slab(160) is formed on the upper and lower chords of a charge steel pipe truss girder.
申请公布号 KR20110126866(A) 申请公布日期 2011.11.24
申请号 KR20100046355 申请日期 2010.05.18
申请人 DAEWOO ENGINEERING & CONSTRUCTION CO., LTD. 发明人 KIM, SEONG WOON;KIM, YOUNG JIN;KIM, IN GYU;OH, HYUN CHUL;MA, HYANG WOOK
分类号 E01D21/00 主分类号 E01D21/00
代理机构 代理人
主权项
地址