The information processor is provided with a receiving unit that receives a request including a period in which the resource is used, a usage status and a cession requirement, a work process storage that stores a pre-cession usage status, a post-cession usage status and a calculating condition, a work time arithmetic expression storage that stores an arithmetic expression of work time, a concession plan preparing unit that determines whether or not it is written to a cession requirement, calculates work time based upon the calculating condition and a specified post-cession usage status and an arithmetic expression, and calculates the capacity of the available resource with which the concession destination user is conceded based upon the calculated work time, the usage period included in the request and the usage period included in the request, and a concession managing unit that makes the resource of the capacity calculated.
|