摘要 |
PURPOSE: An installation method for a tidal power generation system is provided to reduce the installation costs and facilitate repair management of a tidal power generation system by using wires and pulleys to raise or lower a tidal power generator. CONSTITUTION: An installation method for a tidal power generator comprises posts(f,g) which are set on the seafloor, a tidal power generator(h) which is arranged between the posts and coupled with wires or ropes on the top and bottom thereof, and pulleys(a,b,c) which are installed on the top or bottom of the posts. The wires or ropes coupled to the top and bottom of the tidal power generator are connected to the pulleys and pulled to raise the tidal power generator above the sea or lower the tidal power generator to the seafloor. |