摘要 |
PURPOSE: A submerged pier construction system and a pier construction method using the same are provided to reduce construction period without the use of heavy equipment. CONSTITUTION: A submerged pier construction system comprises a floating body(10), a plurality of caisson segments(20), a caisson drawing member(30), a fixing member, a pier form(50), and a pier drawing member(70). The floating body comprises an operation hole(12) and floats on water in which a pier is installed. The caisson segments are successively connected through the operation hole of the floating body. The caisson drawing member guides the caisson segments to top and bottom. The fixing member clinches the floating body on a caisson main body buried in the ground. The pier form is installed in the upper part of the caisson main body. |