发明名称 SYSTEM AND STORAGE OF DETERMINING PRIORITY OF EQUIPMENT INVESTMENT IN POWER DISTRIBUTION SYSTEM
摘要 PURPOSE: A facility investment priority determining system of a distribution system and a recording medium thereof are provided to utilize valuation about the economic investment cost through an economic efficiency model. CONSTITUTION: A first computing module(10) computes a gain according to the increase of the electricity margin. Second and third operating modules compute the gain according to the reduction of the failure cost. A priority determining module(90) determines a priority about a facility investment according to the total gain based on a computing result of the computing modules.
申请公布号 KR20110013903(A) 申请公布日期 2011.02.10
申请号 KR20090071602 申请日期 2009.08.04
申请人 KOREA ELECTRIC POWER CORPORATION 发明人 PARK, CHANG HO;KIM, JUN HYUNG;CHAE, WOO KYU
分类号 G06Q50/06;G06Q10/04 主分类号 G06Q50/06
代理机构 代理人
主权项
地址