发明名称 |
SYSTEM AND STORAGE OF DETERMINING PRIORITY OF EQUIPMENT INVESTMENT IN POWER DISTRIBUTION SYSTEM |
摘要 |
PURPOSE: A facility investment priority determining system of a distribution system and a recording medium thereof are provided to utilize valuation about the economic investment cost through an economic efficiency model. CONSTITUTION: A first computing module(10) computes a gain according to the increase of the electricity margin. Second and third operating modules compute the gain according to the reduction of the failure cost. A priority determining module(90) determines a priority about a facility investment according to the total gain based on a computing result of the computing modules. |
申请公布号 |
KR20110013903(A) |
申请公布日期 |
2011.02.10 |
申请号 |
KR20090071602 |
申请日期 |
2009.08.04 |
申请人 |
KOREA ELECTRIC POWER CORPORATION |
发明人 |
PARK, CHANG HO;KIM, JUN HYUNG;CHAE, WOO KYU |
分类号 |
G06Q50/06;G06Q10/04 |
主分类号 |
G06Q50/06 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|