METHOD OF PERFORATING FOR EFFECTIVE SAND PLUG PLACEMENT IN HORIZONTAL WELLS
摘要
Methods of isolating portions of a subterranean formation are disclosed. The planned settled height of a sand plug (302) in a well bore adjacent a first zone of the subterranean formation is determined. The first zone is then perforated using a hydra jetting tool which is oriented so as to form perforations below the planned settled height of the sand plug.
申请公布号
WO2009118512(A3)
申请公布日期
2011.01.20
申请号
WO2009GB00679
申请日期
2009.03.13
申请人
HALLIBURTON ENERGY SERVICES, INC.;RISPLER, KEITH, A.;MOIR, CLARKE, G.;SURJAATMADJA, JIM, B.;CURTIS, PHILIP, ANTHONY
发明人
RISPLER, KEITH, A.;MOIR, CLARKE, G.;SURJAATMADJA, JIM, B.