摘要 |
A yield prediction is received by a scheduling and dispatch controller, wherein the yield prediction is associated with a manufacturing tool and a product. A weighting of the manufacturing tool is adjusted in a routing algorithm based on the yield prediction. A cost-benefit analysis is computed that identifies a cost and a benefit of manufacturing future products on the manufacturing tool. A determination is made regarding whether to process a future product on the manufacturing tool based on the cost-benefit analysis. |