摘要 |
<p>The formwork has primary beams (3) extending in a primary direction, and secondary beams (4) extending between the primary beams. The secondary beams are constituted of a support assembly for receiving formwork plates. The secondary beams are separated by a space (2) partially filled using a removable temporary protection floor (1) received at the primary beams before laying the formwork plates, where the formwork is made of aluminum alloy.</p> |