发明名称 STEEL SLIT DAM, AND CONSTRUCTION METHOD AND REPAIRING METHOD FOR THE SAME
摘要 <P>PROBLEM TO BE SOLVED: To provide a steel slit dam that can reduce a bending moment applied to posts in the case of supplying boulder or the like while exhibiting a function of preventing the generation of temperature stress by absorbing the expansion of concrete and a steel material caused through a temperature change. <P>SOLUTION: The steel slit dam includes the posts 11 erected between concrete dam bodies 5 constructed with a space in the width direction of a river; sheath pipes 19 embedded in the dam bodies 5; and cross beams 15 laid between the dam bodies 5, with the ends inserted in the sheath pipes 19, and connected to the posts 11. Space holding members 21 retractably interposed from the opening 19a of the sheath pipe 19 are provided in a clearance 20 between the downstream outer peripheral surface 15b of the cross beam 15 and the downstream inner peripheral surface 19b of the sheath pipe 19. <P>COPYRIGHT: (C)2011,JPO&INPIT
申请公布号 JP2010236261(A) 申请公布日期 2010.10.21
申请号 JP20090085224 申请日期 2009.03.31
申请人 NIPPON STEEL & SUMIKIN METAL PRODUCTS CO LTD 发明人 OSUMI HISASHI;SANO KIYOSHI;KOKURYO HIROSHI;HORI KENGO;ISHIDA KATSUYA;TAKEDA IPPEI
分类号 E02B7/02 主分类号 E02B7/02
代理机构 代理人
主权项
地址
您可能感兴趣的专利