摘要 |
<p><P>PROBLEM TO BE SOLVED: To provide a method for operating a power plant including a condenser body through which steam turbine discharge is able to flow, capable of shortening start-up time as much as possible. <P>SOLUTION: The condenser (20) includes a body (50) into and through which steam turbine discharge is able to flow, and first and second cooling members (80, 90) disposed in the body (50), wherein the first and second cooling members (80, 90) are each independently receptive of first and second coolant, respectively, the first cooling member (80), being receptive of the first coolant, is configured to cool the discharge during at least a first cooling operation, and the second cooling member (90), being receptive of the second coolant, is configured to cool the discharge during a second cooling operation. <P>COPYRIGHT: (C)2010,JPO&INPIT</p> |