摘要 |
PROBLEM TO BE SOLVED: To secure construction capacity and safety and to uniformize the quality of concrete pavement. SOLUTION: This concrete pavement method using a slip form paver 24 has a wire net installation step of installing a wire net on a base course through spacers, a concrete supply step of supplying concrete 13 onto the base course with the wire net 12 installed thereon, a concrete slab forming step of spreading and compacting the concrete 13 supplied onto the base course, by the slip form paver 24 and adjusting the surface to form a concrete slab, and a curing step of curing the formed concrete slab. The concrete supply step is performed after the completion of the wire net installation step. COPYRIGHT: (C)2010,JPO&INPIT |