发明名称 |
IED FOR, AND METHOD OF ENGINEERING, AN SA SYSTEM |
摘要 |
<p>The present invention proposes to equip IEDs for Substation Automation, such as bay units or substation PCs, with a Central Processing Unit CPU that includes a first processing core dedicated and configured to execute Protection and Control applications, and a second processing core, or network core, dedicated and configured to handle or decode network communication traffic. In a preferred embodiment, the network core performs computationally expensive pre- or post-processing functionality on top of the 9-2 communication stack. A plurality of network cores or a plurality of network interfaces may be needed to cope with the expected amount of IEC 61850 9-2 traffic.</p> |
申请公布号 |
WO2010079090(A1) |
申请公布日期 |
2010.07.15 |
申请号 |
WO2009EP67711 |
申请日期 |
2009.12.22 |
申请人 |
ABB RESEARCH LTD;WERNER, THOMAS;TOURNIER, JEAN-CHARLES;RICHTER, STEFAN |
发明人 |
WERNER, THOMAS;TOURNIER, JEAN-CHARLES;RICHTER, STEFAN |
分类号 |
H04L12/56 |
主分类号 |
H04L12/56 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|