发明名称 A METHOD OF ESTIMATING THE MAXIMUM POWER GENERATION CAPACITY AND FOR CONTROLLING A SPECIFIED POWER RESERVE OF A SINGLE CYCLE OR COMBINED CYCLE GAS TURBINE POWER PLANT, AND A POWER GENERATING SYSTEM FOR USE WITH SAID METHOD
摘要 An estimation unit is disclosed that estimates on a real-time basis the maximum power generation capacity of a single cycle or combined cycle gas turbine power plant. According to the invention, first, the actual power output and the maximum power generation capacity are calculated relying on a mathematical process model. Subsequently, the calculated actual power output is compared with the measured power output yielding a model-estimation error. Based on the model- estimation error, a correction signal is deduced. The correction signal is applied in a subsequent step to correct the calculated maximum power generation capacity. Further, a controller is disclosed that operates a single cycle or combined cycle gas turbine power plant such that a specified power reserve is maintained. Said controller performs its operation on the control-hierarchic level of load commands. It uses an estimate of the maximum power generation capacity as reference, subtracts a required load offset, and applies the resulting signal as upper limit of the load set-point. The required load offset follows from the specified power reserve. The specification of the power reserve may involve static as well as transient requirements.
申请公布号 WO2009156299(A3) 申请公布日期 2010.06.10
申请号 WO2009EP57444 申请日期 2009.06.16
申请人 ALSTOM TECHNOLOGY LTD;MUELLER, ERIC, ANDRE 发明人 MUELLER, ERIC, ANDRE
分类号 G05B23/02;F01K13/02;F02C9/28;G05B17/02 主分类号 G05B23/02
代理机构 代理人
主权项
地址