摘要 |
PURPOSE: A method for planning load sequence of containers is provided to increase the workability of shipping work by introducing various estimation elements for the container shipping work. CONSTITUTION: Workable slots are selected in a loading target slot group of a ship bay(S202). Candidate containers of searched each slot are selected(S204). By the combination of selected slots and candidate containers, candidate nodes are generated(S206). The generated all of the candidate nodes are evaluated(S207). Based on the estimation, nodes are selected as much as a beam width(S208). The evaluation is calculated according to each node. One node is selected among the generated beam nodes. |