发明名称 METHOD FOR CALCULATING TOTAL MAXIMUM DAILY LOAD USING INSTREAMFLOW REQUIREMENT
摘要 PURPOSE: A daily maximal allowable contamination load calculation method using a river maintenance flow rate is provided to maintain the consistency between upper and lower streams and to present the realistic target amount. CONSTITUTION: A daily maximal allowable contamination load calculation method using a river maintenance flow rate is as follows. An object area for determining the river maintenance flow rate is selected. The necessary flow rate of the chosen object area and the necessary flow rate are calculated. For the necessary flow rate, the mean minimum flow and the ecology are considered according to each area stream. For the necessary flow rate, the external appearance is considered. The determined river maintenance flow rate becomes the standard flow rate.
申请公布号 KR20090111975(A) 申请公布日期 2009.10.28
申请号 KR20080037611 申请日期 2008.04.23
申请人 SEOUL NATIONAL UNIVERSITY INDUSTRY FOUNDATION 发明人 CHUNG, EUN SUNG;KIM, SANG UG;LEE, KIL SEONG
分类号 E02B3/00;G01F1/50;G01N33/18 主分类号 E02B3/00
代理机构 代理人
主权项
地址