发明名称 UNDER GROUND TOP-DOWN METHOD
摘要 A top-down construction method of an underground structure is provided to endure lateral earth pressure applied on an underground retaining wall safely. A top-down construction method of an underground structure comprises: a step for building a retaining wall body(10) underground; a step for punching the location in which a main column is installed and setting up a steel column; a step for forming a top-down construction ground by digging inside the retaining wall body; a step for setting up a reference line on the top-down construction ground; a step for coupling both ends of steel beams(40) to the retaining wall body and the steel column respectively by arranging the steel beam on the reference line; a step for manufacturing a slab(60) which is connected to the retaining wall body and in which a concrete inclined sleeve hole is formed; a step for repeating from the excavation step to the slab manufacturing process until a basement floor is formed; and a step for making a retaining wall(70) coupled with the retaining wall body and connected to the ground.
申请公布号 KR20090094971(A) 申请公布日期 2009.09.09
申请号 KR20080020001 申请日期 2008.03.04
申请人 KE BAT SYSTEM. CO., LTD. 发明人 PARK, JUNG JIN;PARK, JUNG HO;JUNG, JOO HEE
分类号 E02D17/04;E02D29/045 主分类号 E02D17/04
代理机构 代理人
主权项
地址