发明名称 PILE CORE POSITION CONFIRMATION METHOD
摘要 PROBLEM TO BE SOLVED: To provide a pile core position confirmation method capable of accurately and easily confirming the core position of a pile before and after installing the pile by using an existing tool. SOLUTION: Length inspection bars 4 are attached to the pile core 1 at two positions in the directions at right angle to each other, respectively. A relief core 2 is formed at the end of each length inspection bar 4. To secure the direction of the length inspection bar 4, one or relief cores 3 are formed between the relief core 2 and the pile core 1 at positions where the relief core 3 is brought into contact with the length inspection bar 4. A pile 5 is set to the pile core 1, and the length inspection bars 4 are set horizontal and brought into contact with the pile core 5 while aligning with the relief core 2 for confirming a pile core first position. COPYRIGHT: (C)2009,JPO&INPIT
申请公布号 JP2009174124(A) 申请公布日期 2009.08.06
申请号 JP20080011040 申请日期 2008.01.22
申请人 ASAHI KASEI CONSTRUCTION MATERIALS CO LTD 发明人 HASEGAWA O
分类号 E02D13/06 主分类号 E02D13/06
代理机构 代理人
主权项
地址