发明名称 ERECTION METHOD FOR REINFORCEMENT CAGE FOR CAST-IN-PLACE PILE
摘要 PROBLEM TO BE SOLVED: To provide an erection method for a reinforcement cage for a cast-in-place pile, which enables the early start of placing of freshly-mixed concrete by increasing the speed of a reinforcement cage adding operation. SOLUTION: A hole at the stage before the formation of the placing hole 3b is drilled as a reinforcement cage adding operation hole 3a in one of the predetermined areas of the drilling of the placing hole. The two reinforcement cages 30 are added in the reinforcement cage adding operation hole 3a, and turned into an extension reinforcement cage 31. After the extension reinforcement cage 31 is inserted into the placing hole 3b, another extension reinforcement cage 31 is added to the extension reinforcement cage 31, so as to bring about an extension reinforcement cage 32 with a length equivalent to the total of the lengths of the extension reinforcement cage 31. After the extension reinforcement cage 32 is erected in the placing hole 3b, the freshly-mixed concrete 43 is placed for the formation of the cast-in-place pile 8. After the completion of the reinforcement cage adding operation in the area, the dead reinforcement cage adding operation hole 3a is further drilled down to serve as the placing hole 3b. COPYRIGHT: (C)2009,JPO&INPIT
申请公布号 JP2009155806(A) 申请公布日期 2009.07.16
申请号 JP20070331783 申请日期 2007.12.25
申请人 MIWA SANGYO KK 发明人 NAKA KOICHI
分类号 E02D5/34 主分类号 E02D5/34
代理机构 代理人
主权项
地址