发明名称 |
UNIT COMMITMENT SYSTEM AND METHOD USING DC OPTIMAL POWER FLOW CONSIDERING THE LIMIT OF TRANSMISSION LINE FLOW |
摘要 |
A unit commitment system and a unit commitment thereof are provided to perform unit commitment by introducing a slack variable considering the system line limit by using a convergence constant changed according to the size of the system and the convergence degree based on the optimal power flow calculation of the transmission line limit. A unit commitment system(10) receives a load estimation information about a generator(30) from an operating system(20) and transmits the unit commitment result of the generator to the operating system by constructing the unit commitment by introducing a slack variable considering the system line limit by using a convergence constant changed according to the size of the system and the convergence degree based on the optimal power flow calculation of the transmission line limit. The operating system transmits the load estimation information about the generator to the unit commitment system, receives the unit commitment result of the generator from the unit commitment system, and performs the operation of the system.
|
申请公布号 |
KR20090068765(A) |
申请公布日期 |
2009.06.29 |
申请号 |
KR20070136517 |
申请日期 |
2007.12.24 |
申请人 |
KOREA ELECTRO TECHNOLOGY RESEARCH INSTITUTE |
发明人 |
MIN, SANG WON;KIM, TAE HYUN;OH, TAE KYOO |
分类号 |
H02J3/38 |
主分类号 |
H02J3/38 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|