摘要 |
<p><P>PROBLEM TO BE SOLVED: To separate, when carrying out slag fuming for a molten metal discharged from a smelting furnace for zinc or lead smelting, slag and pig lead from the molten metal discharged from the smelting furnace without fail for stably obtaining low-impurity grade of slag after slag fuming and to stably supply the slag reduced in content of lead and arsenic into a slag fuming furnace. <P>SOLUTION: The molten metal discharged from a smelting furnace 1 is received in a ladle 2 having a bottom drain hole in the bottom. The ladle 2 containing the molten metal is allowed to stand for≥2 min to allow the pig lead to settle down in the bottom of the ladle. The accumulated pig lead is drawn out through the bottom hole and recovered. Then the ladle 2 is tilted to charge the slag and speiss into a slag fuming furnace 3. <P>COPYRIGHT: (C)2009,JPO&INPIT</p> |