发明名称 METHOD FOR UTILIZING TUNNEL EXCAVATED SOIL
摘要 PROBLEM TO BE SOLVED: To effectively utilize excavated soil produced during tunnel excavation in a tunnel. SOLUTION: In this method for utilizing the tunnel excavated soil effectively in the tunnel by reforming and treating the tunnel excavated soil produced during tunnel excavation in the tunnel, a part of the excavated soil is distributed in the tunnel while conveying the soil behind a tunnel excavator 1, quicklime is added to the excavated soil to convey the soil backward while stirring and mixing them and prepare the primary reformed soil, and then solidifying material is added to the primary reformed soil to prepare the secondary reformed soil by stirring and mixing them in order to utilize the secondary reformed soil in the tunnel. COPYRIGHT: (C)2009,JPO&INPIT
申请公布号 JP2009108583(A) 申请公布日期 2009.05.21
申请号 JP20070281710 申请日期 2007.10.30
申请人 SHIMIZU CORP 发明人 HAMAGUCHI KOICHI;URATA OSAMU;TAN HIROMI;AOYAMA TETSUYA;YOSHIZAWA HISASHI
分类号 E21D9/12 主分类号 E21D9/12