摘要 |
PROBLEM TO BE SOLVED: To provide a carrying method capable of efficiently carrying mortar and concrete manufactured by batcher plants 2<SB>1</SB>and 2<SB>2</SB>arranged in a place of the height not less than a top part of a dam bank body in completion, at a preparation site of the dam bank body 1. SOLUTION: The concrete is carried to the preparation site of the dam bank body 1 by a carrying facility such as a cable crane 4 in a state of being loaded in a bucket 3, and is inputted in a hopper 9 arranged at the preparation site. The concrete is loaded in a dump truck 10 from the hopper 9, and is carried to a concrete placing place of the preparation site. While, the mortar is carried to the preparation site of the dam bank body 1 via a pipeline 11. The mortar is loaded in a truck mixer 16 from the pipeline 11, and is carried to a mortar placing place of the preparation site. COPYRIGHT: (C)2009,JPO&INPIT
|