发明名称 MORTAR-CONCRETE CARRYING METHOD TO PREPARATION SITE OF DAM BANK BODY
摘要 PROBLEM TO BE SOLVED: To provide a carrying method capable of efficiently carrying mortar and concrete manufactured by batcher plants 2<SB>1</SB>and 2<SB>2</SB>arranged in a place of the height not less than a top part of a dam bank body in completion, at a preparation site of the dam bank body 1. SOLUTION: The concrete is carried to the preparation site of the dam bank body 1 by a carrying facility such as a cable crane 4 in a state of being loaded in a bucket 3, and is inputted in a hopper 9 arranged at the preparation site. The concrete is loaded in a dump truck 10 from the hopper 9, and is carried to a concrete placing place of the preparation site. While, the mortar is carried to the preparation site of the dam bank body 1 via a pipeline 11. The mortar is loaded in a truck mixer 16 from the pipeline 11, and is carried to a mortar placing place of the preparation site. COPYRIGHT: (C)2009,JPO&INPIT
申请公布号 JP2009030375(A) 申请公布日期 2009.02.12
申请号 JP20070196453 申请日期 2007.07.27
申请人 OKUMURA CORP 发明人 TOZAWA KIYOHIRO;ISHIBASHI NORIHIDE
分类号 E02B7/00;E04G21/02 主分类号 E02B7/00
代理机构 代理人
主权项
地址