发明名称 TUNNEL CONTOUR HOLE BLASTING METHOD USING DETONATING CODE
摘要 A tunnel back break reduction blasting method having an instantaneous nonelectric detonator and a detonating fuse is provided to reduce the back break corresponding to an electronic detonator and to obtain a flat blasting surface with excellent lag precision, and to protect the remaining bedrock of a tunnel effectively by blasting after blasting an outer auxiliary hole, thereby and applying destructive force toward a free surface only. A tunnel back break reduction blasting method having an instantaneous nonelectric detonator and a detonating fuse comprises the steps of perforating charge holes of a cut hole, a stopping hole, a bottom hole, a contour auxiliary hole and a contour hole formed on the front section of a tunnel according to the location, charging a detonator and an explosive to each charge hole, charging an instantaneous nonelectric detonator and an explosive to the outermost contour hole and connecting a non-electric detonator tube to a detonating fuse of 5g/m, and then connecting a non-electric detonator corresponding to the detonation lag of the outermost contour hole, and setting up the detonation time.
申请公布号 KR20090004303(A) 申请公布日期 2009.01.12
申请号 KR20070068933 申请日期 2007.07.06
申请人 SAMSUNG C&T CORPORATION;KORYO NOBEL EXPLOSIVES CO., LTD.;DONG-A GEOLOGICAL ENGINEERING CO., LTD. 发明人 LEE, HYUN GU;AHN, BONG DO;JU, WOEN TAE;LEE, SEA HWUN
分类号 E21D9/00;F42D1/00 主分类号 E21D9/00
代理机构 代理人
主权项
地址