发明名称 METHOD OF EXECUTION OF REPAIR-INSULATING OPERATIONS IN WELL
摘要 FIELD: oil and gas industry. ^ SUBSTANCE: invention refers to oil producing industry, particularly to methods of supplying backfill material into well for execution of repair-insulating operations; invention is designed for additional pressurisation of flow string. The method consists in assembly of a cement bridge, in theoretical assessment of volume and level of backfill material in the well, in lowering the flow string, in pumping backfill material into the well to a damaged interval. After completion of the cement bridge installation before pumping backfill material fluid is withdrawn from the well, the safe depth of flow string placement is calculated, then flow string is lifted and its low end is set for 30 or more meters above the calculated safe depth of flow string placement. ^ EFFECT: facilitating normal completion of repair-insulating operations owing to exclusion of dilution of backfill material and avoiding lower part of flow string clamping during supply of backfill material into the well. ^ 2 ex
申请公布号 RU2342516(C1) 申请公布日期 2008.12.27
申请号 RU20070112905 申请日期 2007.04.06
申请人 OTKRYTOE AKTSIONERNOE OBSHCHESTVO "TATNEFT'" IM. V.D. SHASHINA 发明人 KADYROV RAMZIS RAKHIMOVICH;ANDREEV VLADIMIR ALEKSANDROVICH;SAKHAPOVA AL'FIJA KAMILEVNA;ZHIRKEEV ALEKSANDR SERGEEVICH
分类号 E21B33/13 主分类号 E21B33/13
代理机构 代理人
主权项
地址