摘要 |
<P>PROBLEM TO BE SOLVED: To provide a hot water supply system which can be operated as a boiler in addition to operation as an absorption heat pump. <P>SOLUTION: The hot water supply system has an absorption heat pump 101, a boiler 301, and a controller 150. The controller 150 receives parameters Tg, Pg, T1, T2, T3 relevant to a temperature or a pressure of the absorption heat pump 101 to determine whether to operate the absorption heat pump 101, or to operate the boiler 301. <P>COPYRIGHT: (C)2007,JPO&INPIT |