发明名称 METHOD OF OPERATING A COMBINED HEAT AND POWER PROCESS AND GAS TURBINE BUILDING HEATING SYSTEM
摘要 A method of operating a combined heat and power process of building heating having a heating circuit and a gas turbine building heating system (1) with which in particular said method can be carried out. In particular, it is important that the building heating has a maximum heat demand, wherein the energy used in the combined heat and power process is partly converted into electrical energy and the process is carried out with an arrangement of multi-stage design. By means of the issuing expanded gas flow, heat is supplied to the heating circuit, with this gas flow being cooled. As a function of the heat demand of the building heating, the gas flow issuing from the first gas turbine stage is compressed to a higher degree by means of the compressor of the second gas turbine stage, which consists only of a turbine and a compressor.
申请公布号 EP1991771(A1) 申请公布日期 2008.11.19
申请号 EP20070726570 申请日期 2007.03.01
申请人 GEBR. BECKER GMBH 发明人 SCHERER, VIKTOR;PFOST, HEINER;HENNING, HANS-HEINRICH;DABRUCK, MARKUS;SCHLIEPER, MARK
分类号 F02C6/18 主分类号 F02C6/18
代理机构 代理人
主权项
地址