发明名称 |
СПОСОБ ПОЛУЧЕНИЯ ПОЛУФАБРИКАТА ДЛЯ МЕТАЛЛУРГИЧЕСКОГО ПЕРЕДЕЛА |
摘要 |
FIELD: metallurgy. ^ SUBSTANCE: at receiving of semi-finished product preliminary treated mould by lime mortar of conveyor belt is filled in layers by alternation of iron-carbon alloy, temperature of which is higher liquidus temperature on 130 - 280C, and oxide material of fraction 0.01 - 10 mm. Oxide material is fed from doped bins into mould central part and it is located in 1 - 3 layers. Thickness of layers of oxide material and iron-carbon alloy is no less than 20 mm. Filling of iron-carbon alloy into mould is implemented at conveyor rate 8-14 m/min. Correlation of length to width of each mould is (4 - 4.20): 1. ^ EFFECT: it is provided hardening of semi-finished product, increasing of yield. ^ 3 dwg |
申请公布号 |
RU2007108968(A) |
申请公布日期 |
2008.09.20 |
申请号 |
RU20070108968 |
申请日期 |
2007.03.12 |
申请人 |
Открытое акционерное общество "Новокузнецкий металлургический комбинат" (RU) |
发明人 |
Павлов В чеслав Владимирович (RU);Дев ткин Юрий Дмитриевич (RU);Годик Леонид Александрович (RU);Козырев Николай Анатольевич (RU);Томских Сергей Геннадьевич (RU) |
分类号 |
B22D3/00 |
主分类号 |
B22D3/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|