摘要 |
A tower fixing apparatus for a tower crane and a construction method thereof are provided to prevent damage to the tower crane and separation of the tower from the tower crane and to prevent stress concentration on the tower crane due to eccentricity of the tower. A tower fixing apparatus for a tower crane includes a base(300), a ground fixing tool(10), a wall fixing part, a wire rope(34), and a mast. The base is installed at the ground. The ground fixing tool is fixed to the base. The wall fixing part is fixed to a building structure. The wall fixing part is connected to the mast of the tower crane using the wire rope. The ground fixing tool includes a plurality of vertical plates(11), and a plurality of horizontal plates(12) perpendicular to the vertical plates. The horizontal plate has four bolt holes to which height adjustment bolts(13) are fastened. |