摘要 |
PROBLEM TO BE SOLVED: To recover an elevator as early as possible by securing the safety of operation after the recovery when the elevator is stopped by an earthquake. SOLUTION: When an elevator is stopped by an earthquake (S11 to S13), an operation control part installed in a control device performs three inspection operations in order as the operations for automatic recovery. In the first inspection operation, devices are inspected for presence or absence of abnormality while reciprocating a car from the uppermost floor to the lowermost floor at low speed (S16). In the second inspection operation, after confirming the results of the first inspection operation, a door is inspected for opening/closing motion while stopping the car at each floor and moving at a rated speed (S18). In the third inspection operation, the state of traveling of the car is inspected while reciprocating the car from the uppermost floor to the lowermost floor at a rated speed after confirming the results of the second inspection operation (S20). Consequently, the elevator can be recovered as early as possible by securing the safety of the operation after the recovery. COPYRIGHT: (C)2008,JPO&INPIT |