摘要 |
PROBLEM TO BE SOLVED: To provide a new framework capable of efficiently carrying out finishing stake installation work. SOLUTION: This method is characterized by comprising a process which installs a finishing stake pile in such a manner that it can be seen through from a position where a surveying instrument is installed near an alignment such as a structure and the like; a process which obtains a position of the installed finishing stake pile using the surveying instrument; a process which determines a foot of a perpendicular drawn from the position-obtained finishing stake pile to the alignment as an alignment dividing point; a process which calculates the height and direction of the determined alignment dividing point based on the alignment; a process which installs a batten on the position-obtained finishing stake pile according to the alignment based on the height and direction of the calculated alignment dividing point; and a process which calculates a distance of the perpendicular and marks a position corresponding to the determined alignment dividing point on the batten based on the distance. COPYRIGHT: (C)2008,JPO&INPIT
|