发明名称 |
SYSTEM FOR ALLOCATING STORAGE PERFORMANCE RESOURCE |
摘要 |
A method and structure for a multi-workload storage system is disclosed that is adapted to determine if an additional workload can be placed on the storage system. The invention has storage elements and a proxy load generator connected to the storage elements. The proxy load generator is adapted to create a proxy workload based on an additional workload from a potential client. The proxy workload has a reduced duty cycle when compared to a duty cycle of said additional workload. A control server is connected to the storage elements and the proxy load generator. The control server applies the proxy workload to the storage elements during discontinuous time slices.
|
申请公布号 |
US2008021996(A1) |
申请公布日期 |
2008.01.24 |
申请号 |
US20070867031 |
申请日期 |
2007.10.04 |
申请人 |
CHAMBLISS DAVID D;JADAV DIVYESH |
发明人 |
CHAMBLISS DAVID D.;JADAV DIVYESH |
分类号 |
G06F15/16;G06F3/06;G06F15/173 |
主分类号 |
G06F15/16 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|