发明名称 Construction method of underground structure using concrete filled pipe roof and concrete wall
摘要 A construction method of an underground structure using a concrete filled steel pipe roof and a concrete wall is provided to apply effectively to the soft ground for a wall. The construction method of an underground structure using a concrete filled steel pipe roof and a concrete wall comprises the steps of: indenting upper gallery pipes(110a,110b) from right and left ends of a roof of an underground structure in the longitudinal direction of an underground structure; indenting many slab pipes(120) continuously from one upper gallery pipe to the other gallery pipe and indenting lower gallery pipes(130a,130b) on the lower part of the ground for wall construction; arranging reinforcing pipes in the slab pipes and placing concrete; excavating a space for a side wall of an underground structure downward from the upper gallery pipes; arranging reinforcing bars in the lower gallery pipes and placing concrete from the lower gallery pipes to the upper part of the side wall; arranging reinforcing bars in the upper gallery pipes and placing concrete; excavating the inside soil of the underground structure composed of the upper gallery pipes, the slab pipes, the side wall and the lower gallery pipes; and placing bottom concrete.
申请公布号 KR100794609(B1) 申请公布日期 2008.01.14
申请号 KR20060003855 申请日期 2006.01.13
申请人 发明人
分类号 E02D29/045 主分类号 E02D29/045
代理机构 代理人
主权项
地址