发明名称 |
VACUUM CONSOLIDATION DRAIN METHOD, AND MANDREL FOR SEALING LAYER TO BE BACKFILLED |
摘要 |
PROBLEM TO BE SOLVED: To provide a vacuum consolidation drain method capable of fully performing sealing work for a sealing layer even though a bore hole is formed in the sealing layer after pulling out a mandrel. SOLUTION: A draining member 2 with a water drain hose connected to its top end is poured vertically in a weak stratum 9 by using a backfilling mandrel 14 for the sealing layer. Thereafter, the mandrel 14 for backfilling the sealing layer is pulled out. A mandrel pulling bore hole 13 formed in the sealing layer 10 by the mandrel 14 for backfilling the sealing layer is filled up with a raw material 18 having air tightness such as mud or mud water discharged from a discharge hole 16 of the backfilling mandrel 14 for the sealing layer. COPYRIGHT: (C)2008,JPO&INPIT
|
申请公布号 |
JP2007270534(A) |
申请公布日期 |
2007.10.18 |
申请号 |
JP20060098215 |
申请日期 |
2006.03.31 |
申请人 |
PENTA OCEAN CONSTR CO LTD |
发明人 |
NIIYA HIROSHI;YONETANI HIROSHI;SHIODA KOJI |
分类号 |
E02D3/10 |
主分类号 |
E02D3/10 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|