发明名称 CONTINUOUS HOT DIP PLATING-CONTINUOUS HEAT TREATING EQUIPMENT FOR STEEL STRIP
摘要 PROBLEM TO BE SOLVED: To provide continuous hot dip galvanizing-heat treating equipment for a steel strip and continuous heat treating equipment for a steel strip where, e.g., regarding continuous hot dip galvanizing-heat treating equipment for a steel strip or equipment for performing continuous heat treatment at the poststage of continuous annealing equipment for a steel strip, in the case a plurality of heat holding zones are arranged, the increase of a load on equipment cost and the increase of an installing space accompanying the installation of temperature controllers for the heat holding zones can be suppressed. SOLUTION: For example, regarding continuous hot dip galvanizing-heat treating equipment where a primary heating zone 5, a primary heat holding zone 6, and a primary cooling zones 7, 8 having functions of performing alloying and/or quenching treatment after hot dip galvanizing to a steel strip 1 are arranged, and, a secondary heating zone 9, a secondary heat holding zone 10, and a secondary cooling zone 11 having functions of performing tempering treatment are arranged after the primary cooling zones, a temperature controller 20 for the primary heat holding zone 6 and the secondary heat holding zone 10 is arranged so as to be used in common and to be changeably usable. COPYRIGHT: (C)2007,JPO&INPIT
申请公布号 JP2007247041(A) 申请公布日期 2007.09.27
申请号 JP20060076074 申请日期 2006.03.20
申请人 NIPPON STEEL CORP 发明人 SHUTOKU ATSUSHI;HOSHINO MASANORI;ITO TAKESHI
分类号 C23C2/28;C21D9/56 主分类号 C23C2/28
代理机构 代理人
主权项
地址