摘要 |
<p><P>PROBLEM TO BE SOLVED: To provide a work planning system and its program capable of easily comparing and verifying evaluation values of a plurality of plans with one another and easily correcting the plans, in work planning. <P>SOLUTION: The work planning system and the program are configured so that the evaluation value of each of the plans is displayed along with the plan, an allocation direction can be set for each process, an automatic planning process can be traced by a progress check on a check point or by setting on a break point, each process is represented in a Gantt chart based on current time with a progress time axis linearized, and a high-load process can be put out. <P>COPYRIGHT: (C)2007,JPO&INPIT</p> |