发明名称 DESIGN AND CONSTRUCTION METHOD OF A TWIN TUNNEL BY PRE-EXCAVATION OF THE TUNNEL'S MAIN SECTION AND DOUBLE SUPPORT OF CENTRAL PART AND METHOD HOW TO OPTIMIZE REINFORCEMENT LEVEL OF A TUNNEL BY CHANGING RESULT OF STRESSES AND STRAINS OF THE MAIN STRUCTURES OF THE TUNNEL
摘要 A construction method of a two-arch tunnel using a load distribution plate is provided to secure the stability of tunnel excavation by supporting with a load distribution plate and a steel supporter and to reduce a period of construction by executing the excavation and reinforcement for the main section and the center of a tunnel simultaneously. A construction method of a two-arch tunnel using a load distribution plate comprises the steps of: excavating the main section of a left tunnel and reinforcing the surrounding ground; excavating the center and reinforcing the ground; installing a load distribution plate and a steel supporter(40) to support the center; excavating the main section of a right tunnel and reinforcing the ground; installing a waterproof sheet and connecting with the load distribution plate; constructing side gutters of the footing and both sides of a middle bearing wall; connecting the load distribution plate, a horizontal drainpipe and a vertical drainpipe; forming a middle bearing wall(91) by dismantling oblique struts by stages and placing a steel supporter and lining at once; and placing pavement concrete and installing a barrier wall of the middle bearing wall.
申请公布号 KR20060125129(A) 申请公布日期 2006.12.06
申请号 KR20050046970 申请日期 2005.06.01
申请人 YUN, SEOK RYNL 发明人 YUN, SEOK RYNL
分类号 E21D9/00;E21D11/00 主分类号 E21D9/00
代理机构 代理人
主权项
地址