发明名称 VERFAHREN ZUR STEUERUNG EINER FERTIGUNGSANLAGE
摘要 <p>The invention relates to a method for control of a production plant (1) and/or assembly plant for the production of modules or individual products (2) in a production process controlled by a control programme (16). The production plant (1) comprises one or more mechanically and/or electrically and/or electronically connected stations, for example, a supply station (3, 4), a processing station (5), a discharge station (6) and a plant controller (15), by means of which the control programme (16) is carried out, whereby data recorded by sensors (18) on the stations of the production plant (1) is transmitted to the plant controller (15). The data for the production process is stored in a data store (19).</p>
申请公布号 AT501642(A1) 申请公布日期 2006.10.15
申请号 AT20050000518 申请日期 2005.03.25
申请人 AMS - ENGINEERING STICHT GESELLSCHAFT M.B.H. 发明人
分类号 G06Q10/00;(IPC1-7):G05B19/418;G05B23/02;G05B15/02;G05B17/02;G06Q90/00 主分类号 G06Q10/00
代理机构 代理人
主权项
地址