摘要 |
PROBLEM TO BE SOLVED: To provide a greening crib work by which a stable installation against an uneven face of the ground side can be obtained with ease and even greening can be obtained against the whole execution face. SOLUTION: A spray type pressure projection structure 1 which is anchored on the ground by use of an anchorage material 2 like an anchor or the like is installed in the condition that the respective structures independently are positioned and partition members 3 provided with a clearance through which water and nutriment can permeate are placed to partition greening earth. COPYRIGHT: (C)2006,JPO&NCIPI
|