摘要 |
<P>PROBLEM TO BE SOLVED: To prevent the transfer of a group job from being interrupted by executing an off-line job. <P>SOLUTION: A scheduler receives a status which indicates that the analysis of a member print job belonging to the group job is started, by a printer 102 subjected to the transmission of the member print job from a print server 101 (S711), and immediately provides instructions on the stop of the print job (S712). These steps are repeated for all print jobs in a group (S716). When the reception of all the jobs is checked (S720), a job restart instruction is issued in order from the leading job, in accordance with the order of the print jobs in the group (S721). Thus, it is not until all the print jobs in the group are received that the execution of the print jobs can be started. <P>COPYRIGHT: (C)2006,JPO&NCIPI |