发明名称 |
Method for modelling the production of an oil-bearing formation |
摘要 |
The method has five stages: Stage 1 consists of constructing a flow simulator based on physical data measured at the deposit; Stage 2 consists of determining a first analytical model linking the production of the deposit to a time function, taking into account parameters that influence production. In Stage 3 the first model is adjusted to a finite number of production values obtained from the simulator. In Stage 4 a new production value is selected from the simulator, and in Stage 5 a second model is produced by adjusting the first model in such a way that the second model interpolates the new productin value. |
申请公布号 |
EP1630348(A1) |
申请公布日期 |
2006.03.01 |
申请号 |
EP20050291700 |
申请日期 |
2005.08.08 |
申请人 |
INSTITUT FRANCAIS DU PETROLE |
发明人 |
SCHEIDT, CELINE;ZABALZA-MEZGHANI, ISABELLE;COLLOMBIER, DOMINIQUE;FERAILLE, MATHIEU |
分类号 |
E21B41/00;E21B44/00 |
主分类号 |
E21B41/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|