摘要 |
<p>Building material mix of cement, sand, water, synthetic resin foam particles and additive(s) contains 180-220 kg cement, 110-150 kg boiler sand, 80-100 kg water, 100 l foam particles and additives in the form of a foamer and optionally flow aid. An Independent claim is also included for production of the mix by mixing the cement, sand, water and foamer in a forced mixer, adding this mix to the foam particles in a mobile mixer, and mixing.</p> |