摘要 |
A method for constructing a graviloft retaining wall comprising the steps of: constructing a base slab-cum leveling course (IEIFGH) comprising one of the ingredients cement concrete, rubble and masonary; constructing a retaining wall (ABCDEE1) in several parts, a first part (JKEE1) constituting of ingredient identical to said base slab-cum-leveling course; backfilling i.e. placement of earth behind the retaining wall and suitably compacting upto a level (KKI); constructing a second portion (SDKJ) of said retaining wall (ABCDEE1) in one or plurality of lift depending upon a height (DE) of said second portion (SDEE1) of the retaining wall, simultaneous placing of earth behind the .retaining wall define clearly during construction of the parts of the retaining wall, at least upto a commencing level (SD) of construction of a loft (S1CMLDS); constructing the loft (S1CMLDS) at a level (SD) comprising reinforced concrete slab; constructing a remaining part (ABCSI) of the retaining wall (ABCDEE1) either in two installments or in a single installment depending on the height of the remaining past of the regaining walk (ABCDEE1). |