发明名称 METHOD FOR CONSTRUCTING SLOPE-PROTECTION RETAINING WALL
摘要 PROBLEM TO BE SOLVED: To not only improve a safety against a slope failure but also reduce a cost in the short term of works when a slope is cut in the case of the construction of a protecting retaining wall. SOLUTION: Triangular ditches 11 are excavated in the cross direction to the slope 10, and soldier beams 1 are driven to the triangular ditches 11. The upper-end section sides are cut in the slope 10, and horizontal sheathings 5A are interposed among each soldier beam 1. The lower sections of the horizontal sheathings 5A are cut in the slope 10, and the sheathings 5A are dropped to cut faces along each soldier beam 1. New horizontal sheathings 5 are interposed among the upper end sections of each soldier beam 1, and the horizontal sheathings 5 are abutted against the horizontal sheathings 5A at one stage. The protecting retaining wall for the slope is constructed by repeating the cut of the lower sections of the horizontal sheathings 5A at one stage and the droppings of the horizontal sheathings 5A and interpositions among the upper end sections of the soldier beams 1 of the new horizontal sheathings 5. COPYRIGHT: (C)2006,JPO&NCIPI
申请公布号 JP2006002554(A) 申请公布日期 2006.01.05
申请号 JP20040239418 申请日期 2004.08.19
申请人 NATL INST OF INDUSTRIAL SAFETY INDEPENDENT ADMINISTRATIVE INSTITUTION 发明人 TOYOSAWA YASUO;ITO KAZUYA
分类号 E02D29/02;E02D5/03 主分类号 E02D29/02
代理机构 代理人
主权项
地址