发明名称 PRECEDING HANDRAIL OF PREFABRICATED SCAFFOLD
摘要 PROBLEM TO BE SOLVED: To provide a preceding handrail of a prefabricated scaffold which is smoothly moved up and down even when the prefabricated scaffold has poor assembly accuracy, and which is easy to handle and is installed easily and quickly. SOLUTION: A guide rail 7 is installed along a stud 3 of a frame 2 of the prefabricated scaffold 1. A strut 11 of the preceding handrail 10 is arranged on the guide rail 7 to be movable up and down. A stopper 16 is mounted on the strut 11 to be engageable with a horizontal member 5 of the frame 2. An extensible horizontal bar 12 is installed between adjacent struts 11. When the prefabricated scaffold 1 is assembled upward, the strut 11 is raised along the guide rail 7 and the horizontal bar 12 for safe work is installed around the upper scaffold in advance. The strut 11 is easy to handle even when the assembly accuracy of the prefabricated scaffold 1 is poor due to a distortion of the frame 2, etc., since the strut 11 is smoothly moved up and down along the guide rail 7 which is separately installed for the up/down movement . COPYRIGHT: (C)2006,JPO&NCIPI
申请公布号 JP2005307628(A) 申请公布日期 2005.11.04
申请号 JP20040127695 申请日期 2004.04.23
申请人 NIKKO CO LTD;NIKKO SEKKU KK 发明人 TSUKASA DAISUKE
分类号 E04G5/00;(IPC1-7):E04G1/26 主分类号 E04G5/00
代理机构 代理人
主权项
地址