摘要 |
<P>PROBLEM TO BE SOLVED: To shorten the programming time of a fuse element. <P>SOLUTION: A fuse link FL is arranged between a first terminal N1 and a second terminal N2. The first terminal N1, the second terminal N2, and the fuse link FL have a polysilicon layer 13 and an overlying layer 14 containing a metal element, and at least a part of the fuse link FL is an amorphous silicon layer. <P>COPYRIGHT: (C)2005,JPO&NCIPI |