摘要 |
In a shutdown processing performed before the power supply is shut down, acquisition contents, an acquired condition, and a current operating state in a data control unit are recorded in a data recording unit as an operation history. Then, in initiation processing which is performed after a power-on, the recorded operation history is read from the data recording unit, and the operating state at the time of the shutdown is restored based on the read operation history. |