摘要 |
<p>The method involves moving points (3) back and forth while the train (7) is driven over them so that the bogies of each wagon are passed onto two separate tracks (1,2) that are mutually parallel in one region, driving each bogie in the section after the points and unloading or loading the wagon thus arranged in a loading and unloading position.. Independent claims are also included for the following: (A) a railway train for implementing the inventive method (B) and a terminal for implementing the inventive method.</p> |