发明名称 СПОСОБ И УСТРОЙСТВО ДЛЯ ИЗГОТОВЛЕНИЯ ЭЛЕМЕНТОВ ОСНОВАНИЙ И ФУНДАМЕНТОВ
摘要 In a process to construct a deep foundation anchorage point for a building structure, the ground is drilled. A portion of the soil or rock is from the upper section (6) to a crushing station (40) from which the particles are discharged back into the cylindrical void (6) with fluid, as a suspension (20). Fluid drains from the suspension into the surrounding rock. Also claimed is a commensurate assembly.
申请公布号 RU2004103800(A) 申请公布日期 2005.07.27
申请号 RU20040103800 申请日期 2004.02.10
申请人 Бауэр Машинен ГмбХ (DE) 发明人 ШТЕТЦЕР Эрвин (DE)
分类号 E02D3/12;E02D5/46 主分类号 E02D3/12
代理机构 代理人
主权项
地址