摘要 |
<P>PROBLEM TO BE SOLVED: To provide a cable with branches capable of always smoothing load current on both of a high story and a low story of a high-rise building. <P>SOLUTION: In a method for laying a cable with branches on every stories of a building with multiple stories, the cable with branches including a plurality trunk cables connected to each other at one or more parts to shunt load currents of respective trunk cables, and branch cables branching from each of the trunk cables at two or more parts, the respective branch cables branching from one of the trunk cables are laid on the stories selected by skipping one or more stories, and the respective branch cables branching from the other of the trunk cables are laid on the skipped stories, thereby smoothing the load current. <P>COPYRIGHT: (C)2005,JPO&NCIPI |